Our Excellent Remodel Adventure

Thursday, January 19, 2012

LevelQuik

Left downstairs bedroom
Right downstairs bedroom
We had a little snafu with the level of the concrete slabs in the kids' rooms. They were an inch or so lower than the existing family room slab. We need a completely level condition for the radiant heat. LevelQuik self-leveling concrete to the rescue!
Posted by Kathleen at 4:45 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2012 (75)
    • ►  December (3)
    • ►  November (3)
    • ►  October (1)
    • ►  September (2)
    • ►  July (3)
    • ►  May (4)
    • ►  April (12)
    • ►  March (19)
    • ►  February (11)
    • ▼  January (17)
      • This is the hard part
      • The next round of inspections
      • New electrical sub panel
      • Neighborliness
      • A great time for a storm
      • Foundation drains are in!
      • Continued electrical work...
      • LevelQuik
      • Moving the beast
      • Electricity, eeee-lec-tri-city
      • Next on deck: the deck!
      • Boring, but necessary.
      • Stucco and downspouts
      • Where should we put the powder room toilet?
      • Progress on the downstairs bath
      • Fireplace install
      • You know you're under construction when...
  • ►  2011 (63)
    • ►  December (12)
    • ►  November (10)
    • ►  October (13)
    • ►  September (16)
    • ►  August (12)
Simple theme. Powered by Blogger.